Power Trust Equipment PTE-7ES Specifications Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
Installation of operating handle
Installation of operating handle Installation of operating handle
Installation of operating handle
Take out the operating handles (54/55)from the carton, and
screw them onto the receiving hole (52)of the handles, then
tighten up.(See Figure 4)
Bolt on rod control cover with included bolts.
OPERATON
OPERATONOPERATON
OPERATON
1. Plan your work site
Plan your work sitePlan your work site
Plan your work site. Work safely and save effort by
planning your work before and have your logs
positioned where they can be easily reached. Have a
site located to stack the split wood or load it onto
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 27 28

Comments to this Manuals

No comments