Power Trust Equipment PTE-7ES Specifications Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
I. Main body
J. Splitting wedge
All the screws, bolts, washer and jigs are in the packing
box.(The complete list is on the attached parts list).
IN
ININ
INSTALLATION OF WHEEL AND SUPPORTING FEET
STALLATION OF WHEEL AND SUPPORTING FEETSTALLATION OF WHEEL AND SUPPORTING FEET
STALLATION OF WHEEL AND SUPPORTING FEET
Carefully take out the Log Splitter from the packing box
with the help another person and put it onto the foam
material on the supporting surface(the foam material in the
packing box together with the machine).(See Figure 2)
Put the main part on the foam material and fix with 2 screws
(21) and 2 nuts (20) and tighten up the supporting
feet(19).(See Figure 3)
On the main part that has been fixed on the foam block with
the supporting feet use safetv ring (59)to fix 2 wheels
(60)onto the shaft of wheel frame(61).then use the wheel
shaft cover (58)to cover the wheels.
Make sure that the wheels are not obstructed and turn
uniformly. (See Figure 3)
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 27 28

Comments to this Manuals

No comments